11th and R Street Sacramento, CA
Design Development
| Unit Count | 122 |
|---|---|
| 1 Bedroom | 96 |
| 2 Bedroom | 8 |
| Townhomes | 6 |
| Penthouses | 12 |
| Density Ratios | |
|---|---|
| Commercial SF | 35,000 |
| Acres | 1.18 |
| Parking | 235 |
| Type | Garage |
Holliday Development
-
1500 Park Ave Suite 200
Emeryville, Ca 94608
P: 510.547.2122
![]() |
![]() |
![]() |
Developer: Holliday Development
Project Partner: Capital Area Development Authority
Architect: Mogavero Notestine Associates
Brand + Allen
Structural Engineer:Tipping Mar + Associates
Contractor: Cannon Constructors
The Capitol Lofts Development is a proposed mixed-use residential rehabilitation of the existing CADA warehouse building, located
at 1108 R Street in Sacramento, CA. The project contains an adaptive re-use of the existing 91,287 square feet six-story
reinforced concrete warehouse building along with a separate 9,377 square feet three-story brick and timber framed building.
It also contains several new construction elements including a six-level structured parking garage with and façade lofts along
R Street and 12th Street and garage podium loft penthouses and a boutique hotel.
In addition, our team has formed a relationship with SMUD’s (Sacramento Municipal Utility District) Research and Development
team in partnership with NREL (National Renewable Energy Lab). This team is analyzing the implementation of the
maximum sustainable and renewable technologies by reducing the energy consumption between 50%-80% while generating
its own energy in an effort to produce a zero energy project. The project be monitored, documented and toured as a critical
example and case study of sustainable design.